Entrance Sign
Top 10 Yards 2013
Top 10 Yards 2012
Top 10 Yards 2011
Top 10 Yards 2010
Top 10 Yards 2009
Holiday Contest 2012
Holiday Contest 2011
Holiday Contest 2010
Holiday Contest 2009
Previous

Links (suggestions?)

 

Management Office:

FirstService Residential
8375 N. Oracle Rd. 150
Tucson, AZ  85704

(855) 333-5144

Manager:
Kolleen Weber

 

Entrance Sign Construction

Linda Vista and Albatross



Sample Plan - Elevation View (PDF)


Completed sign


We had a good turn out for the entrance sign groundbreaking on Saturday April 30th at 7:30am . We had just enough help to get 'er done. A few residents stopped by to check on the progress and cheer us on.

Robert, Fred, Colin and Keith (and a jackhammer) dug the sign footings and we were even able to install all the rebar.

The County inspection on the footings passed May 3, 2011 and we poured the concrete on Thursday morning May 5th at 11am.  The Masons built the block wall May 25-26 and did the stucco on May 27th.  Fred painted the base coat on July 15, 2011.  The roof tile was donated by Ralph Hays Roofing and Keith installed it on November 30, 2011.  We finalized the fonts and sizing of the lettering and ordered them on Dec. 1, 2011.  The lettering and logo were designed and installed by Territorial Sign Co. www.TerritorialDirect.com

The Entrance Sign was completed on December 16th, 2011.  
Thanks to all who helped make it happen. 
Construction Plans (PDF)

(Simulation) Feb 2010

April 12, 2011

May 27, 2011

Roof tile installed Nov. 30, 2011

Lettering Installed Dec. 16, 2011

December 2011

(More progress pictures below.)

The colors we have picked for the sign are from Sherwin-Williams Paints.
 Stucco -Kilim Beige SW6106, Trim - Egret White SW570, Lettering - Fiery Brown SW6055.  

Projects to complete the sign include:

  • Setting re-bar in the footings (done April 30, 2011)
  • Pouring concrete footings (done Thursday May 5, 2011)
  • Laying concrete block (done May 25-26, 2011)
  • Installing electrical conduit for future outlets and lighting
  • Stucco (done May 27, 2011)
  • Picking paint colors (At the June 14th Board meeting)
  • Painting (Friday July 15th 7am.)
  • Find some roof tile and edge tile to match the houses (done)
       (Roof tile Donated by Ralph Hays Roofing)
  • Paint roof tile to match orange roofs (done November 20, 2011)
  • Install roof tile (done November 30, 2011)
  • Design and order the sign lettering (Installed December 16, 2011)
      Lettering by Territorial Sign Co.  www.TerritorialDirect.com

Thanks to everyone who helped with this long awaited project.
 
Keith 
Keith Pullen, President(520) 991-3462 cell
President@TucsonCountryCrossing.com                Construction Plans (PDF)





 Chuck, our landscaper, with Modern Designs Landscaping came out to help us remove the Oleander and the old stump that was in the way of the sign.  Keeping with the volunteer spirit, they donated their time. Thanks Chuck!

Groundbreaking day
April 30, 2011



Rob and Fred start the first phase, 
digging the footings.

Rob, Fred and Colin (and jackhammer)
almost finished digging.



We had time Saturday morning 
to cut and install the rebar.

Ready for County inspections, 
picking up the tools.



Poured concrete 5/5/2011

Block delivered 5/24/2011



Block work started 5/25/2011

Block work continues 5/26/2011



Brick caps 5/26/2011

Stucco 5/27/2011



Stucco completed 5/27/2011

Trim Painted





Roof tile installed 11/30/2011
Ready for lettering...

Lettering Installed 12/16/2011



Stump and Oleander in the way.

Layout done, ready to dig.

Rebar complete, ready for County inspection




Concrete in place

1st course of block

Block work almost finished




Foam pop outs and bricks

Stucco

Stucco finished




Fred painting 7/15/2011

Keith installing roof tile
11/30/2011

Roof tile installed
Tile donated by 
Ralph Hays Roofing




Lettering Installed 12/16/2011

December 2011

 


Completed sign
 

 


Construction Plans (PDF)

Sample Elevation View (PDF)

     
 

www.TucsonCountryCrossing.com
 
Copyright © 2008-2016 Tucson Country Crossing HOA. All rights reserved. 
Website Hosted by
PullenInc.com        Page last updated: January 27, 2016